88
      Monday
      94 / 76
      Tuesday
      94 / 76
      Wednesday
      96 / 76

      Little River swing bridge closed for repairs on October 30th


      The Little River Swing Bridge will be closed to vehicle traffic on Wednesday, October 30th from 9 a.m. to 2:30 p.m.


      The South Carolina Department of Transportation will be doing routine bridge maintenance.


      Motorists are advised to use US 17 or Robert Edge Parkway as possible alternate routes.

      component-story-more_media_horiz-v1-01
      FOLLOW US ON TWITTER